From: route@monster.com
Sent: Friday, April 08, 2016 12:07 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 PMP
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
eferigbo, rogers abel 7 Ekani
Street mile iv rumuepirikom,
p.h, rivers state. +234 8037380878 rogers_abel@yahoo.com
I am a result oriented interface engineering/information management
professional with a background in electrical electronics engineering coupled
with a high proficiency in project management and its methodologies,
presently a part of a multibillion dollar FPSO Topsides construction project
for a major operator and a multibillion dollar infrastructural project.
Highly skilled at engineering, project controls and project information
management which I have deployed in ensuring high efficiency in my various
functions thereby contributing enormously to the success of the project.
·
Project team member for the actualization and implementation of NIS
ISO 9001:2008 Standards for Weltek Limited, 2012 - 2013. ·
Helped to save and secure $250,000 for Weltek Limited via ensuring
that there’s complete documents and data deliverables for procured materials
from her Vendors and appropriately catalogued / entered into the live-link
extranet and database system. ·
Design and Implementation of Hotel Management Software. ·
Construction of 10KVA AC Arc Welding Machine. ·
Seminar presentation, “Effects of Corona in overhead Transmission
line”. ·
Implementation and Construction of Indicator/Alarm Call System.
·
Post Graduate Diploma (pgd)
- Information and
Computer Technology (ICT), Federal
University of Technology Owerri, Imo State, 2012. ·
Higher National Diploma (HND) - Electrical Electronics
Engineering, credit level, Federal Polytechnic Nekede, Owerri, 2008 ·
ordinary national Diploma (ond) - Electrical Electronics
Engineering, credit level, Bayelsa State College of Arts and Science,
Agudama-Epie, 2005. ·
PMP Training course, 2013.
Primavera P6, AutoCAD, Microsoft project, EDMS, Familiar with SAP,
Microsoft Window Applications: Excel, Power-point, Word, Assess
and Outlook.
·
PMP Training Certificate. ·
Certificate, Nigerian Institute of Safety Professionals: (HSE
Basic-Level 1, General HSE, and HSE Supervision – Level 3). ·
Diploma in Autocad Package (2D, 2D Advance & 3D).
·
Design and Implementation of Hotel Management Software. ·
Construction of 10KVA AC Arc Welding Machine. ·
Seminar presentation, “Effects of Corona in overhead Transmission
line”. ·
Implementation and Construction of Indicator/Alarm Call System.
COMPANY: Weltek Limited -
Plot 307 Danjuma Drive Trans Amadi, Port Harcourt, Rivers State. YEAR:
March, 2010 - Present JOB
TITLE: Project Information Management/Document
Controller/Interface Engineer PROJECT
SPONSOR: Shell Nigerian Exploration and Production Company - SNEPCo PROJECT
VALUE: $7.3m (USD) PROJECT BONGA MAIN INTEGRATION PROJECT
(BMIP) - Engineering, Procurement Installation and Construction (EPIC);
Topsides Engineering Installation for the Bonga FPSO. RESPONSIBILITIES · Maintains all division project documentation and
correspondences. · Ensures that policies and procedures are being adhered
to with respect to project process in quality, deliverables success criteria,
and technical measurement baselines. · Maintain document control registers/documents for
incoming and outgoing project document. · Maintain, operate and interface the electronic
information management system with the project sponsor’s. · Expedite responses to transmittals sent for
review/comment by contacting the relevant discipline and project stakeholder. · Production and updating of project status reports for
weekly/monthly meetings liaising with the project controls
(Scheduler/Planner). · Preparation of Minutes of Meetings for Project progress
review meeting. · Manages the BMIP livelink extranet/EDMS. · Scanning, creation of CD’s and files manipulation for
project/organization database for reference and operational asset. · Coordinates all activities related to the document
control, including technical documents, drawings and commercial
correspondence. · Ensures every project documents are complete (revised,
signed and numbered), current and stored appropriately. · Makes sure that controlled copies of latest approved
documents and drawings are given to the appropriate project team member. · Assure document quality to include completeness,
accuracy and compliance with established procedures and updates. · Filing and archiving of documentation to facilitate
easy retrieval at a later date. · Mentor and provide on-the-job training
to new member staff. PROJECT GREATER PORT HARCOURT CITY
DEVELOPMENT PROJECT - 33Kv Supply to Phase 1A of Greater Port Harcourt. RESPONSIBILITIES ·
Interfaces with the project team engineers
with a view to ensure that they comply with approved drawing s and
procedures. ·
Identified and itemized materials to be
procured from an approved shopfloor drawing. ·
Drawing/design of surge protection system
with the aid of AutoCAD software. ·
Documents and catalogued work products
information / reference document in the livelink extranet. ·
Manages the documents deliverables for the
project.
·
Engr. Onyeoziri Longinus QA/QC Manager, Weltek Nig. Ltd. Plot 307, p.o. box 6588, T/Amadi, 08037079176, lonyeoziri@weltekng.com ·
Akpana, Solomon Isegi Principal
Technologist/Head, Civil Engineering
Laboratories, Rivers State
University of Science & technology, Nkpolu, P.M.B.
5080 PH. 08037943606. |
|
|
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
|
|